We hired a company that specializes in water line replacements and the work got started last Tuesday. They hand dug a partial trench, then they were able to mole a line through the other half of the front yard. They drilled a hole through the side of the foundation to run the new copper pipe into the house and replaced the pressure and shut-off valve in the basement. Thankfully, they only had to work with piping in the unfinished part of the basement. The project took about 4.5 hours and the water was only shut off for 2 hours. The crew accidentally cut the Comcast Cable line when the dug the trench though, so it took two extra days to fill the hole in. Thankfully, the hole was closed before the weekend and we were able to call the project completed.
Here are some photos from the project. I know they aren't exciting for all, but I thought my father in law might be interested.
This trench was done by hand. The guys took care in cutting the grass into sod-like pieces that they could lay back on the lawn after the work was done.
This hole, by the house, between the two bushes, was dug using the backhoe. Brennan loved watching the machinery in our front yard. Thankfully, the crew used plywood and tarps to protect our lawn and walkway. They ran the copper pipe through a PVC pipe in the foundation, then cemented it in place. A waterproof seal was placed on the outside of the foundation where the new hole was drilled.
Our old water line, which came in through the floor was cut and sealed off in cement. The new line has an easy working shut-off valve now.
Lastly, the holes in the front yard were filled in and the grass was placed back in place. Not bad, considering what had happened to it just days earlier.